Heat pump rebates

Editorial illustration of heat pump equipment and connections on an installation planning sheet.

Where Should the Outdoor Heat Pump Unit Go?

Planning a heat pump around Canada's new rebate? Check outdoor-unit airflow, snow, drainage, noise and service access before agreeing on the location.

Editorial illustration of two equipment proposals, a calculator and a pencil.

No Energy Audit? Your Heat Pump Still Needs Proper Sizing

Canada's new heat pump rebate will not require an energy audit. Learn why sizing still matters and what to ask for in a home-specific heating plan.

Editorial illustration of heat pump equipment and electrical connections on an installation scope sheet.

Does a Heat Pump Need an Electrical Panel Upgrade?

A panel upgrade is not automatic when installing a heat pump. Use this Ontario checklist to clarify electrical work, backup heat and rebate assumptions.

Hudson editorial illustration of a 2027 program-launch calendar beside a home heating plan.

Heat Pump Rebate: What the November 1 Installation Date Means

Canada has announced a November 1 retroactivity date for its heat pump rebate. Check what it means for your installation, Ontario approval and project records.

Editorial illustration of two proposals, a calculator and a pencil for comparing project costs.

Heat Pump Rebate Payments: Plan for the Upfront Cost

Plan contractor payments separately from a heat pump rebate. Compare the announced federal process with Ontario HRS and use a payment-timing worksheet.

Hudson editorial illustration of three installation handover folders: equipment record, operating guide and application status.

Heat Pump Installation Handover: What to Keep for Your Rebate File

A practical heat pump handover checklist: installation records, operating instructions, outstanding work and rebate follow-up, with current Ontario rules.