Rooftop Cooling Tower Replacement
A major rooftop upgrade combining heavy equipment logistics, precision rigging and crane-assisted installation—coordinated from street-level staging through final rooftop placement.
Major HVAC replacements and building upgrades across Toronto and the GTA.
A major rooftop upgrade combining heavy equipment logistics, precision rigging and crane-assisted installation—coordinated from street-level staging through final rooftop placement.
A comprehensive mechanical renewal across an occupied condominium: replacing 200+ Fan Coils, upgrading riser isolation valves and controls, and coordinating installation, testing and system balancing through a staged, suite-by-suite program.
Specialized rooftop cooling project installing two temporary 5-ton rental AC units to supply fresh, conditioned air to resident hallways during peak summer heat at a downtown Toronto condominium.
Two-month modernization program in a 50+ storey tower at Toronto’s waterfront, replacing every actuator and 3-way valve across more than 800 fan coils to deliver consistent comfort and reliability for residents.
Complete natatorium dehumidifier replacement at one of Toronto's most recognizable towers, steps from the arena where the Raptors and Leafs play — precision rigging, new refrigeration and ductwork connections, and full commissioning of the pool's climate system.
Domestic hot water boiler replacement at a premier 40-storey waterfront condominium, retiring a failed Laars Rheos and installing a 2-million-BTU Camus DynaForce condensing boiler with new venting, piping, and full commissioning.
Late-90s condominium received a full boiler room upgrade, retiring a failing Bryan flexible-tube boiler and installing a 1.2 MMBTU RBI Futera III modulating boiler with new venting, pumping header, and factory commissioning.
Comprehensive Dectron DRY-O-TRON pool dehumidifier installation and system upgrades for a prestigious luxury building's pool and spa area, featuring advanced pressure management and automated air vent technology.
Specialized chiller plant intervention inside a 49-storey CityPlace tower in downtown Toronto. Goodway brush-cleaning of every individual tube, end-to-end scope inspection, plugging of compromised tubes to keep the chiller online at near-design capacity, and full restoration of the inhibitor loop and liquid-cooling heat exchanger.
Hudson technicians completed a thorough cleaning and descaling of the mechanical room humidifier at a prestigious Midtown high-rise, restoring optimal humidity control and system efficiency.
High-precision emergency repair for a prestigious 50-story tower near Scotiabank Arena, featuring complex rooftop equipment hoisting, advanced aluminum brazing techniques, and rigorous leak detection protocols to restore critical elevator machine room climate control systems.
Major heat exchanger rehabilitation project for a downtown high-rise, including mechanical cleaning, chemical descaling, and complete replacement of critical components.
Critical heat exchanger replacement project at a boutique luxury mid-rise in Toronto's Midtown area, addressing a defective internal safety switch that caused burner alarm conditions.
Large-scale restoration project for a prestigious Yorkville building, including blower fan replacements, thermostat upgrades, and complete system rehabilitation across multiple units.
Emergency response and comprehensive recovery for 89 affected suites following a major flood event at a prestigious Harbourfront building, including rapid deployment, thorough diagnostics, and complete system restoration.
Complex rooftop temporary makeup air unit installation for an entire building, featuring precision ductwork integration and advanced climate control systems.